Raining Again!

And for the next two days


I cannot thank my neighbor, Josh, and his family enough for the help they have given me in trying to get the addition dry. In a normal year, we would not have had to put forth the amount of effort to try and protect the materials from the elements, but this year is an extraordinary one with rain more than 50% of the time.

Josh came home from a trip on Thursday night, and he worked with me for the last two days to try and get the framing done to a point where we can sheath the main floor roof and then put plastic over it. That would still leave the trusses and stick framing of the second story roof... but one thing at a time.

Today we pretty much completed framing the main floor... and need to get sheathing up on the roof. Unfortunately it has started raining, and will do so for the next two days. It is not a gentle rain either. I con't imagine what this will mean for the water in the snow pack, which has not really started to melt yet. I am sure many people will incur a lot more water damage than I will.

Here are a couple of pictures showing the framing work which we completed over the last two days.



Again, thanks to Josh, and also to Erika, and their two children, Victoria and Gage, who have given up time with Josh so he could help me on the project.

Tuesday, May 24, 2011

Another day!


So after all my engineering of the second story drainage, it was an unmitigated disaster. I was foolish enough to think that all my construction on the second floor would channel the water toward the one available exit point. There was at least one serious flaw which led to an accumulation of a massive amount of water outside of the drainage channel I had prepared. So during a deluge at 3 AM, I was awakened by the sound of infrastructure failing and several tens of gallons of water inundating the second story.

So once again my day started with a squeegee and a towel to try and get the water off the deck... This was at 6 AM. I have deluded myself into thinking that I have repaired the system (still will require manual intervention during a serious storm), and I then proceeded to work on completing the fascia around the front of the addition so we can sheath the roof and get the trusses onto the second story.

Todays pictures show the small amount of work I was able to complete on the fascia. I had to go to Home Depot to get more wood to complete this work. I can fit 5 (maybe 6) 8' 2x6 pieces of wood into the Accord... up through the trunk, right next to the driver.

Not sure what I will do tomorrow (supposed to be a sunny day). Here are some pictures of the fascia work, and a picture of a dry interior.





By the way, the winds came up this afternoon, and I had to spend an hour or so trying to get the plastic into order. Doing so meant that there will be no rain tonight; had I failed to repair the plastic we would be guaranteed a deluge.

Monday, May 23, 2011

So here is what's happening


Of the last ten days there have been two which were rain free. Sometimes we have showers, sometimes torrential downpours, sometimes it just rains all day. I spend fully half of my time (if not more) dealing with water issues. I would like to keep the project somewhat dry, but am largely unsuccessful.


These pictures were taken yesterday in the afternoon, I am fairly sure we had some rain in the morning. We have started putting the roof sheathing on the lower level, and need to get thqt completed before we attempted to put up the trusses for the second story roof. Until we get the second story roof up and the sheathing on it, we are going to continue to have serious problems keeping the project dry if it continues to rain as it has been. I have tried several different approaches to try to keep th second floor dry and the water diverted away from the structure (otherwise it leaks though onto the main floor kitchen and bathroom area, and thence down into the crawl space. In general all attempts have been less than successful. I have tried a new approach today and am hopeful of a better result. Of course now that I have gotten new plastic on, the wind is starting to blow... I do not think the plastic can survive even a mild wind.




We placed the post which will support the roof beam on the front porch. I used a four foot "Sono" tube, but it was not quite high enough, so we improvised with a Heineken Carton and some duct tape.



And here are a few more pictures of the project... some taken from my roof.








Sunday, May 15, 2011

May 15TH Progress Report


Almost two weeks have passed. Lots of time has been spent trying to keep water off the project and out of our house. I have not been very successful. None-the-less, Josh and I are making progress.







Monday, May 02, 2011

May Day Progress Report


The entire day was spent working on the chimney chase. We cannot finish the subfloor on the second story until the chase is removed.




I also ruined one of the second floor joists by cutting it an eighth of an inch too short, and I want to add an additional joist under the bathtub. So I had to order two more 18 foot joists which should be available on Tuesday.

Today we will have to work on getting the chase down today and building the other main floor walls. I am pretty sure we can determine the height of those walls, since we now know the exact height of the top of an existing roof joist above a spot on the deck, So we just need to measure the distance from that spot to the wall in question, and deduct 5" for every 12" of distance.