Saturday, March 12, 2011

Today's Progress


After planting a couple of trays of seeds including additional tomatoes, peppers, State Fair Zinnias, and African Daisies. I gathered up by tools of destruction, and set out on a wrecking
rampage.

I have now come to the tub surround and plumbing. I will not be touching these until I have my permit.




Friday, March 11, 2011

Update


Last Thursday, March 3rd, the architect delivered the final plans, along with the engineers documents. Quite a body of work for a simple addition. I immediately took two sets of plans down to Sandy City for them to review so I may get my building permit. I am still waiting to hear from the city.

On Friday the 4th Alina and Nick arrived for their annual skiing outing. They had to hurry back a day early to take care of some business, and they left at 10:30 this morning. I got right to work.

Here are the before and after shots of todays destruction.


Sunday, February 13, 2011

Very close now
... a final few cosmetic things and the plans will go to the engineer.





Friday, February 11, 2011

For those who have difficulty understanding the proposed second story space, here are some additional pictures.

Wednesday, February 09, 2011

We got the final plans from the architect today.  Major changes are in the upstairs where we are pretty much into a second story again.  Two remaining questions... do we make the guest shower into a steam room as well, and do we put a window in the guest shower?

Thursday, February 03, 2011

The Empty space...

...demands an addition!


Real Commitment


The addition project really got underway to day when we pulled the trigger on the Cottonwood tree.  The tree would probably have had to come down within a few years anyways, and we would certainly kill it when we dig the foundation for the addition as the side yard is filled with its roots.



8:00 am


8:30 am


9:00 am


9:30 am


10:00 am


10:30 am


11:00 am



Lunchtime

Monday, January 31, 2011

Project done for now...

Finished spackling, sanded and put on a coat of primer.  Will wait until all renovations are done before finishing.  Once the new wall configuration is complete in the west bedroom, we will put in a new engineered wood floor, new trim throughout, then paint.


Friday, January 28, 2011

Let there be more light!

Today I switched the bed and love-seat around and then put recessed lighting in the west room.  Now I finally have enough light in the rooms to see what I am doing, and can finish up with a final coat of mud.


Thursday, January 27, 2011

Let there be light...

Today I removed the fan and its one insipid light from the east room.  In its place, I installed 9 recessed lights.  You can only see six in the picture as three are hidden by the wall.

Tuesday, January 25, 2011

Wall board is up...
and first application of joint compound is complete.



Sunday, January 23, 2011

Progress...
Our friends Don and Denise left today about 10AM so I was able to get back to working on the bedroom.  I framed in the opening and tidied up all the low voltage wiring.  It now all lives in a nice blue conduit.  I started putting on drywall, but ran out.  Next pictures will be with the opening with the drywall.


Friday, January 21, 2011

Some Decisions are Pending!

Just received first sketches from the architect.  Any thoughts on the two proposals?




Wednesday, January 19, 2011

I just couldn't help myself






The deed is done!  The house did not fall over.  Now for the trim work.
Getting Started

Boredom finally overcame me.  The books on Geothermal had not yet arrived.  So I determined to get going with something I could do, remove the non-bearing wall between the two guest bedrooms that we intend to make into one room as part of the remodel.

I cleaned out the office area on Monday, and put up my office furniture for sale on KSL. On Tuesday I began to tear down the drywall on the office side of the wall.  We are having guests on Friday and Saturday night, so thought I would defer tearing down the wall in the guest bedroom until after they leave (we will see if I can resist the temptation.)

Two issues.  Although the wall separating the two rooms is non-bearing, it does have a shear strap embedded in it.


Neither Josh nor I can understand why the shear strap is needed, so I am planning on removing it.  If the house topples, we will understand the need.

The other issue is that the electricity for the bedroom ran through this wall. I cut the wire prior to understanding that it was the sole source of power to the sockets in the guest bedroom.  Today I will alleviate the situation by installing a wire through the attic to re-power the room.

The books arrived yesterday afternoon, and I am trying to see if they contain the information I need to determine if I can go geothermal at a reasonable cost.

Sunday, January 16, 2011

Updates to the Addition Plans.


The plans for the mother-in-law apartment are evolving.

I had intended to put a full basement under the apartment.  Because the apartment will butt up against portions of the  the existing foundation that are not full basement height, this has become a practical impossibility.  With the full basement off the table, my architect had two proposals.  One, to build the addition over a crawl space; or two, to pour an above grade concrete slab.  The concrete slab would forever embed any below floor mechanical stuff (drains, duct work) within it.  I have opted for the crawl space.

I have been thinking about an alternate use for the ground which will be below the addition; and am exploring the possibility of using that ground as a heat source / sink for a geothermal heating / cooling system for the addition.

A geothermal heating / cooling system is exactly like a regular heat pump system except that it uses the ground, instead of the atmosphere, and the source or sink for heat.  The ground, at a depth of 4 - 6 feet is a fairly constant temperature year round, around 55 degrees.  It is sort of obvious that using the ground, at 55 degrees, to dissipate the heat from your house would be a lot more efficient than trying to dump the heat into an atmosphere which is 80 - 90 - 100 degrees.  Not so obvious is the heating side of the equation until you realize that the dense ground at 55 degrees holds a lot more heat than winter air at 20 - 30 - 40 degrees.

The cooling side of a geothermal system is exactly like a regular air conditioning system except that the heat generated by compression of the coolant is dissipated into the ground instead of into the atmosphere.  Since the ground is already quite cool, the dissipation is much more efficient.  The ground will become warmer in the area of the dispersing coils, but that warmth will be dispersed.

When you switch to heating, the processes are reversed.  It is as if you are trying to cool down the ground by dissipating the heat in the ground into the house.  So you compress the coolant,  then cool it using the air in the house (in the process, the air in the house warms);  then you use the heat in the ground to re-expand the coolant.  The ground grows cooler for a while in the area of the expansion coils, but that soon dissipates into the vastness of the earth.

In a sense, during the summer, you are storing warmth in the ground which will be recaptured during the winter to heat the house; and in the winter you are storing coolness to be recovered in the summer.

It is really an electrical heating / cooling system.  Electricity is used to run the compressors, to circulate the coolant into the ground, and to circulate the air within the structure.

Tuesday, December 28, 2010

Our Next Project

Our project for 2011 is going to be adding a "mother-in-law" apartment to our house.  At some point, Carolyn's mother, Char (Charlotte) may be unable to live alone in her house, and we want to be able to have her com live with us if she chooses to do so at that point in her life.  There is no way we could configure our house as it is to accomodate someone who may have difficulty climbing stairs.  We want to make sure that Char can have access to our living areas (family room, kitchen, dining room, and living room), and still have privacy in her own apartment.

The project will involve building a 450 sq. ft. addition to the west of the existing house.  The addition will have a full basement underneath it.  The following drawing shows the house as it will appear from the north (NNW, actually), when the addition is complete.

The picture below shows the apartment .  The entrance from inside our house will be a hallway through what is now the laundry room and the downstairs guest bathroom.  The bathroom will be reconfigured; and the laundry room will be moved upstairs (where all the laundry is).  The addition will include a kitchenette with a refrigerator, sink, dishwasher, microwave, but no stove.  There will be a small washer and dryer.  The bathroom will be amply sized with a large walk-in shower.  The sleeping area will be screened off from the living area.  The ceiling over the living area will be vaulted.


Several improvements will also be made to the second floor.  We will be turning the two, somewhat small guest bedrooms into one large guest bedroom.  The existing guest bathroom will be changed into the laundry room.  The second floor behind the bathroom will be extended by 4 feet, and the new guest bathroom will be built there.  There will be an entry from the guest bedroom into the guest bathroom. 

I hope to keep posting progress on this blog.

The next steps are to get the drawings completed, get the building permit, get a quote on getting the foundation poured, and taking down the large cottonwood, which while not strictly in the way, will be killed when we excavate for the cellar.

Tuesday, April 27, 2010

Adjustments were made…

We had intended to extent the wall across the entire back fence, but it became obvious that it would overwhelm the flower garden to the west of the maple tree.  So I re-engineered the wall, and ended it at the maple tree.

_WSP8068

I built a wall around the spruce tree at the west to bookend the flower garden…

_WSP8069

and also built a wall around the other maple tree…

_WSP8072

Today, the winds have picked up, and a big storm is coming… we will have rain, snow, and freezing temperatures over the next 4 days.

Sunday, April 25, 2010

Weekend Projects

The cool and rainy weather at the end of last week forced me inside, and was a demonstration to me of how little I have to do right now if I cannot get outside.  It is a good thing that I had Char’s basement to work on during the winter months, but that is now a done thing (except for putting up the closet doors).  Right now, if the weather keeps me inside, I don’t seem able to keep myself productively preoccupied.

So the sunny (and almost warm) weather this weekend was very welcome. 

First project (which really could have been a rainy weather project) was the building of the tomato cages.  I have built cages over the last three years, and now think that I have found a formula that will work to produce sturdy cages that will last several seasons.  They are now made out of redwood and with much more substantial dimensions than in years past.  And I double staple (with one inch staples) all of the joints.  The raw material for the cages were 12, 8 foot 2 x 6 pieces of redwood.  Josh helped me make quick work of cutting these into the pieces to make the 24 tomato cages which will support this years tomato crop.  We cut them on Friday afternoon (rainy day) and on Saturday I put them all together.  Since I have no other place to put them, I put them in the garden, where they await their client tomato plants.  The tomato plants are doing very well in Josh’s greenhouse.

_WSP8061_WSP8063

The second project involved extending the wall I had built around the extended garden.  Carolyn liked the looks of the wall so much that she asked me to extend it around the rest of the garden beds.  I got about another 50 feet done on Saturday afternoon, and Sunday.  It is no small matter to haul all of those stone home from Home Depot.

_WSP8060

_WSP8064

I also cut all the capstones, so there are no more ugly gaps.

So that was my weekend.