... a final few cosmetic things and the plans will go to the engineer.
Sunday, February 13, 2011
Friday, February 11, 2011
Wednesday, February 09, 2011
Thursday, February 03, 2011
The addition project really got underway to day when we pulled the trigger on the Cottonwood tree. The tree would probably have had to come down within a few years anyways, and we would certainly kill it when we dig the foundation for the addition as the side yard is filled with its roots.
![]() |
Lunchtime |
Monday, January 31, 2011
Friday, January 28, 2011
Thursday, January 27, 2011
Sunday, January 23, 2011
Our friends Don and Denise left today about 10AM so I was able to get back to working on the bedroom. I framed in the opening and tidied up all the low voltage wiring. It now all lives in a nice blue conduit. I started putting on drywall, but ran out. Next pictures will be with the opening with the drywall.
Friday, January 21, 2011
Wednesday, January 19, 2011
Boredom finally overcame me. The books on Geothermal had not yet arrived. So I determined to get going with something I could do, remove the non-bearing wall between the two guest bedrooms that we intend to make into one room as part of the remodel.
I cleaned out the office area on Monday, and put up my office furniture for sale on KSL. On Tuesday I began to tear down the drywall on the office side of the wall. We are having guests on Friday and Saturday night, so thought I would defer tearing down the wall in the guest bedroom until after they leave (we will see if I can resist the temptation.)
Two issues. Although the wall separating the two rooms is non-bearing, it does have a shear strap embedded in it.
Neither Josh nor I can understand why the shear strap is needed, so I am planning on removing it. If the house topples, we will understand the need.
The other issue is that the electricity for the bedroom ran through this wall. I cut the wire prior to understanding that it was the sole source of power to the sockets in the guest bedroom. Today I will alleviate the situation by installing a wire through the attic to re-power the room.
The books arrived yesterday afternoon, and I am trying to see if they contain the information I need to determine if I can go geothermal at a reasonable cost.
Sunday, January 16, 2011
The plans for the mother-in-law apartment are evolving.
I had intended to put a full basement under the apartment. Because the apartment will butt up against portions of the the existing foundation that are not full basement height, this has become a practical impossibility. With the full basement off the table, my architect had two proposals. One, to build the addition over a crawl space; or two, to pour an above grade concrete slab. The concrete slab would forever embed any below floor mechanical stuff (drains, duct work) within it. I have opted for the crawl space.
I have been thinking about an alternate use for the ground which will be below the addition; and am exploring the possibility of using that ground as a heat source / sink for a geothermal heating / cooling system for the addition.
A geothermal heating / cooling system is exactly like a regular heat pump system except that it uses the ground, instead of the atmosphere, and the source or sink for heat. The ground, at a depth of 4 - 6 feet is a fairly constant temperature year round, around 55 degrees. It is sort of obvious that using the ground, at 55 degrees, to dissipate the heat from your house would be a lot more efficient than trying to dump the heat into an atmosphere which is 80 - 90 - 100 degrees. Not so obvious is the heating side of the equation until you realize that the dense ground at 55 degrees holds a lot more heat than winter air at 20 - 30 - 40 degrees.
The cooling side of a geothermal system is exactly like a regular air conditioning system except that the heat generated by compression of the coolant is dissipated into the ground instead of into the atmosphere. Since the ground is already quite cool, the dissipation is much more efficient. The ground will become warmer in the area of the dispersing coils, but that warmth will be dispersed.
When you switch to heating, the processes are reversed. It is as if you are trying to cool down the ground by dissipating the heat in the ground into the house. So you compress the coolant, then cool it using the air in the house (in the process, the air in the house warms); then you use the heat in the ground to re-expand the coolant. The ground grows cooler for a while in the area of the expansion coils, but that soon dissipates into the vastness of the earth.
In a sense, during the summer, you are storing warmth in the ground which will be recaptured during the winter to heat the house; and in the winter you are storing coolness to be recovered in the summer.
It is really an electrical heating / cooling system. Electricity is used to run the compressors, to circulate the coolant into the ground, and to circulate the air within the structure.
Tuesday, December 28, 2010
The next steps are to get the drawings completed, get the building permit, get a quote on getting the foundation poured, and taking down the large cottonwood, which while not strictly in the way, will be killed when we excavate for the cellar.
Tuesday, April 27, 2010
Adjustments were made…
We had intended to extent the wall across the entire back fence, but it became obvious that it would overwhelm the flower garden to the west of the maple tree. So I re-engineered the wall, and ended it at the maple tree.
I built a wall around the spruce tree at the west to bookend the flower garden…
and also built a wall around the other maple tree…
Today, the winds have picked up, and a big storm is coming… we will have rain, snow, and freezing temperatures over the next 4 days.
Sunday, April 25, 2010
Weekend Projects
The cool and rainy weather at the end of last week forced me inside, and was a demonstration to me of how little I have to do right now if I cannot get outside. It is a good thing that I had Char’s basement to work on during the winter months, but that is now a done thing (except for putting up the closet doors). Right now, if the weather keeps me inside, I don’t seem able to keep myself productively preoccupied.
So the sunny (and almost warm) weather this weekend was very welcome.
First project (which really could have been a rainy weather project) was the building of the tomato cages. I have built cages over the last three years, and now think that I have found a formula that will work to produce sturdy cages that will last several seasons. They are now made out of redwood and with much more substantial dimensions than in years past. And I double staple (with one inch staples) all of the joints. The raw material for the cages were 12, 8 foot 2 x 6 pieces of redwood. Josh helped me make quick work of cutting these into the pieces to make the 24 tomato cages which will support this years tomato crop. We cut them on Friday afternoon (rainy day) and on Saturday I put them all together. Since I have no other place to put them, I put them in the garden, where they await their client tomato plants. The tomato plants are doing very well in Josh’s greenhouse.
The second project involved extending the wall I had built around the extended garden. Carolyn liked the looks of the wall so much that she asked me to extend it around the rest of the garden beds. I got about another 50 feet done on Saturday afternoon, and Sunday. It is no small matter to haul all of those stone home from Home Depot.
I also cut all the capstones, so there are no more ugly gaps.
So that was my weekend.
Tuesday, June 16, 2009
Tuesday, May 19, 2009
My absence explained…
…no real excuse for not posting, but the last two weeks have been extremely busy. As I was working my way around the house, trying to get the garden beds ready for their annual infusion of flowers, I decided that the front of the house needed a total remake. The front faces north and gets very little sun, and the gardens are generally sort of anemic; so I proposed that we rip every thing out, put down a patio, and just put plants into pots and planters on the patio. Carolyn thought it was a great idea, and so it was off to Beehive Brick and Stone where we ordered the pavers. They came on Friday, May 8th, and for the next 9 days it was 10 to 11 hour days trying to get the patio done. I even gave up bike rides and running. That project is now complete…
The border around the existing sidewalk is 2 feet wide. The patio area in front of the window is 11 ft x 11 ft. Not sure how it will eventually be decorated, but the paving has been completed.
Next project was to do some work on the “hump”. The “hump” is the mound of dirt which covers the culvert which runs through the west side of our property. I wanted to put in a pathway over to Josh and Erika’s house, as well as do some landscaping. Here is where that project stands after a couple of days…
Now it is on to the deck. I have to refinish all of the horizontal surfaces. I hired some college students to do it last year, and the results of their efforts did not make it though one year.