Monday, January 31, 2011

Project done for now...

Finished spackling, sanded and put on a coat of primer.  Will wait until all renovations are done before finishing.  Once the new wall configuration is complete in the west bedroom, we will put in a new engineered wood floor, new trim throughout, then paint.


Friday, January 28, 2011

Let there be more light!

Today I switched the bed and love-seat around and then put recessed lighting in the west room.  Now I finally have enough light in the rooms to see what I am doing, and can finish up with a final coat of mud.


Thursday, January 27, 2011

Let there be light...

Today I removed the fan and its one insipid light from the east room.  In its place, I installed 9 recessed lights.  You can only see six in the picture as three are hidden by the wall.

Tuesday, January 25, 2011

Wall board is up...
and first application of joint compound is complete.



Sunday, January 23, 2011

Progress...
Our friends Don and Denise left today about 10AM so I was able to get back to working on the bedroom.  I framed in the opening and tidied up all the low voltage wiring.  It now all lives in a nice blue conduit.  I started putting on drywall, but ran out.  Next pictures will be with the opening with the drywall.


Friday, January 21, 2011

Some Decisions are Pending!

Just received first sketches from the architect.  Any thoughts on the two proposals?




Wednesday, January 19, 2011

I just couldn't help myself






The deed is done!  The house did not fall over.  Now for the trim work.
Getting Started

Boredom finally overcame me.  The books on Geothermal had not yet arrived.  So I determined to get going with something I could do, remove the non-bearing wall between the two guest bedrooms that we intend to make into one room as part of the remodel.

I cleaned out the office area on Monday, and put up my office furniture for sale on KSL. On Tuesday I began to tear down the drywall on the office side of the wall.  We are having guests on Friday and Saturday night, so thought I would defer tearing down the wall in the guest bedroom until after they leave (we will see if I can resist the temptation.)

Two issues.  Although the wall separating the two rooms is non-bearing, it does have a shear strap embedded in it.


Neither Josh nor I can understand why the shear strap is needed, so I am planning on removing it.  If the house topples, we will understand the need.

The other issue is that the electricity for the bedroom ran through this wall. I cut the wire prior to understanding that it was the sole source of power to the sockets in the guest bedroom.  Today I will alleviate the situation by installing a wire through the attic to re-power the room.

The books arrived yesterday afternoon, and I am trying to see if they contain the information I need to determine if I can go geothermal at a reasonable cost.

Sunday, January 16, 2011

Updates to the Addition Plans.


The plans for the mother-in-law apartment are evolving.

I had intended to put a full basement under the apartment.  Because the apartment will butt up against portions of the  the existing foundation that are not full basement height, this has become a practical impossibility.  With the full basement off the table, my architect had two proposals.  One, to build the addition over a crawl space; or two, to pour an above grade concrete slab.  The concrete slab would forever embed any below floor mechanical stuff (drains, duct work) within it.  I have opted for the crawl space.

I have been thinking about an alternate use for the ground which will be below the addition; and am exploring the possibility of using that ground as a heat source / sink for a geothermal heating / cooling system for the addition.

A geothermal heating / cooling system is exactly like a regular heat pump system except that it uses the ground, instead of the atmosphere, and the source or sink for heat.  The ground, at a depth of 4 - 6 feet is a fairly constant temperature year round, around 55 degrees.  It is sort of obvious that using the ground, at 55 degrees, to dissipate the heat from your house would be a lot more efficient than trying to dump the heat into an atmosphere which is 80 - 90 - 100 degrees.  Not so obvious is the heating side of the equation until you realize that the dense ground at 55 degrees holds a lot more heat than winter air at 20 - 30 - 40 degrees.

The cooling side of a geothermal system is exactly like a regular air conditioning system except that the heat generated by compression of the coolant is dissipated into the ground instead of into the atmosphere.  Since the ground is already quite cool, the dissipation is much more efficient.  The ground will become warmer in the area of the dispersing coils, but that warmth will be dispersed.

When you switch to heating, the processes are reversed.  It is as if you are trying to cool down the ground by dissipating the heat in the ground into the house.  So you compress the coolant,  then cool it using the air in the house (in the process, the air in the house warms);  then you use the heat in the ground to re-expand the coolant.  The ground grows cooler for a while in the area of the expansion coils, but that soon dissipates into the vastness of the earth.

In a sense, during the summer, you are storing warmth in the ground which will be recaptured during the winter to heat the house; and in the winter you are storing coolness to be recovered in the summer.

It is really an electrical heating / cooling system.  Electricity is used to run the compressors, to circulate the coolant into the ground, and to circulate the air within the structure.

Tuesday, December 28, 2010

Our Next Project

Our project for 2011 is going to be adding a "mother-in-law" apartment to our house.  At some point, Carolyn's mother, Char (Charlotte) may be unable to live alone in her house, and we want to be able to have her com live with us if she chooses to do so at that point in her life.  There is no way we could configure our house as it is to accomodate someone who may have difficulty climbing stairs.  We want to make sure that Char can have access to our living areas (family room, kitchen, dining room, and living room), and still have privacy in her own apartment.

The project will involve building a 450 sq. ft. addition to the west of the existing house.  The addition will have a full basement underneath it.  The following drawing shows the house as it will appear from the north (NNW, actually), when the addition is complete.

The picture below shows the apartment .  The entrance from inside our house will be a hallway through what is now the laundry room and the downstairs guest bathroom.  The bathroom will be reconfigured; and the laundry room will be moved upstairs (where all the laundry is).  The addition will include a kitchenette with a refrigerator, sink, dishwasher, microwave, but no stove.  There will be a small washer and dryer.  The bathroom will be amply sized with a large walk-in shower.  The sleeping area will be screened off from the living area.  The ceiling over the living area will be vaulted.


Several improvements will also be made to the second floor.  We will be turning the two, somewhat small guest bedrooms into one large guest bedroom.  The existing guest bathroom will be changed into the laundry room.  The second floor behind the bathroom will be extended by 4 feet, and the new guest bathroom will be built there.  There will be an entry from the guest bedroom into the guest bathroom. 

I hope to keep posting progress on this blog.

The next steps are to get the drawings completed, get the building permit, get a quote on getting the foundation poured, and taking down the large cottonwood, which while not strictly in the way, will be killed when we excavate for the cellar.

Tuesday, April 27, 2010

Adjustments were made…

We had intended to extent the wall across the entire back fence, but it became obvious that it would overwhelm the flower garden to the west of the maple tree.  So I re-engineered the wall, and ended it at the maple tree.

_WSP8068

I built a wall around the spruce tree at the west to bookend the flower garden…

_WSP8069

and also built a wall around the other maple tree…

_WSP8072

Today, the winds have picked up, and a big storm is coming… we will have rain, snow, and freezing temperatures over the next 4 days.

Sunday, April 25, 2010

Weekend Projects

The cool and rainy weather at the end of last week forced me inside, and was a demonstration to me of how little I have to do right now if I cannot get outside.  It is a good thing that I had Char’s basement to work on during the winter months, but that is now a done thing (except for putting up the closet doors).  Right now, if the weather keeps me inside, I don’t seem able to keep myself productively preoccupied.

So the sunny (and almost warm) weather this weekend was very welcome. 

First project (which really could have been a rainy weather project) was the building of the tomato cages.  I have built cages over the last three years, and now think that I have found a formula that will work to produce sturdy cages that will last several seasons.  They are now made out of redwood and with much more substantial dimensions than in years past.  And I double staple (with one inch staples) all of the joints.  The raw material for the cages were 12, 8 foot 2 x 6 pieces of redwood.  Josh helped me make quick work of cutting these into the pieces to make the 24 tomato cages which will support this years tomato crop.  We cut them on Friday afternoon (rainy day) and on Saturday I put them all together.  Since I have no other place to put them, I put them in the garden, where they await their client tomato plants.  The tomato plants are doing very well in Josh’s greenhouse.

_WSP8061_WSP8063

The second project involved extending the wall I had built around the extended garden.  Carolyn liked the looks of the wall so much that she asked me to extend it around the rest of the garden beds.  I got about another 50 feet done on Saturday afternoon, and Sunday.  It is no small matter to haul all of those stone home from Home Depot.

_WSP8060

_WSP8064

I also cut all the capstones, so there are no more ugly gaps.

So that was my weekend.

Tuesday, June 16, 2009

Honeysuckle

The honeysuckle bush on our fence has very beautiful blossoms this year.

honeysuckle_viewing

Tuesday, May 19, 2009

My absence explained…

…no real excuse for not posting, but the last two weeks have been extremely busy.  As I was working my way around the house, trying to get the garden beds ready for their annual infusion of flowers, I decided that the front of the house needed a total remake.  The front faces north and gets very little sun, and the gardens are generally sort of anemic; so I proposed that we rip every thing out, put down a patio, and just put plants into pots and planters on the patio.  Carolyn thought it was a great idea, and so it was off to Beehive Brick and Stone where we ordered the pavers.  They came on Friday, May 8th, and for the next 9 days it was 10 to 11 hour days trying to get the patio done.  I even gave up bike rides and running.  That project is now complete…

patio_1_viewing

patio_2_viewing

The border around the existing sidewalk is 2 feet wide.  The patio area in front of the window is 11 ft x 11 ft.  Not sure how it will eventually be decorated, but the paving has been completed.

Next project was to do some work on the “hump”.  The “hump” is the mound of dirt which covers the culvert which runs through the west side of our property.  I wanted to put in a pathway over to Josh and Erika’s house, as well as do some landscaping.  Here is where that project stands after a couple of days…

pathway_1_viewing

Now it is on to the deck.  I have to refinish all of the horizontal surfaces.  I hired some college students to do it last year, and the results of their efforts did not make it though one year.

Thursday, April 16, 2009

April 16th – 9 AM – 32 degrees

Its pretty, but……..

april_snow_2 april_snow_1… enough is enough!!!

Tuesday, April 14, 2009

CUPUFU

Sandy City performs a major trash pick up service twice a year.  With the exception of hazardous materials, they will pick up any thing you pile in front of your house and take it to the dump.  Years ago it went by the acronym CUPUFU.  Clean Up Paint Up Fix Up.

This year the spring pick up was on Monday, April 13th.  I spent the entire weekend clearing brush and accumulated leaves off the “hump”.  The hump is a mound between our house and Josh’s house.  It covers a culvert that drains water from a cul-de-sac in back of us.

We clearly won the “biggest pile” contest on our street this year.  In the photo you can see the bags of leaves (at least 20) and the brush and branches that were removed.  There was also some detritus from the basement construction project.  All of the basement stuff disappeared from the pile before Sandy City showed up.  There are people who perform a useful function of salvaging recyclable materials from the trash piles.  We disrespectfully call them scavengers, while they should be called ‘recyclers’.

_WSP4029_edited-1

And this is a picture of the cleaned up “hump”.  It looks like we could make a pleasant area for some purpose under the trees.

_WSP4031_edited-1

Saturday, April 11, 2009

The plants have taken up residence next to the bees

The seedlings have made the journey over to Josh’s Greenhouse.  The have survived their first night, and it is 47 degrees this morning, so I assume they have survived their second.  The greenhouse is heated by a kerosene heater which not only supplies heat, but carbon dioxide as well.

This is a picture of Victoria and the plants in the greenhouse.

victoria_and_plants

The bees live right next to the greenhouse. You can see a corner of the hive over Victoria’s right shoulder. 

This is Josh and his bees.  He had just arrived home from a trip, and his bees arrived while he was gone.

josh and bees

Thursday, April 02, 2009

Josh’s Greenhouse

This is the future home of Pratt’s Plants.  I went over and helped Josh put the windows on the greenhouse.  He is recycling windows that he replaced in his house last summer.  The front window is 6’ X 6’ and must weigh somewhere around 300 pounds.

future_greenhouse_1future_greenhouse_2 

Josh assures me that the Greenhouse will be ready for plants in a couple of days.  On Saturday his bees are coming.  He is going to have a hive to the left of the greenhouse.  I hope to be able to take some pictures of the arrival of the bees.  Apparently they come in a cardboard box, with the Queen in her own private little container.  Josh’s brother is going to do the honors of moving the bees from the cardboard box to the beehive.  Josh is going to be flying (smart man!)

Pratt’s Greenhouse (continued)

Marion questioned in a comment why I am not growing more vegetables… I will repeat my response (edited) here…

The reason I am not planting more vegetables is one of real estate, preference, economics and climate.

We would have to dig up serious parts of the lawn to grow more vegetables.  Large parts of the lawn are unusable because of tree roots. The Cottonwood tree has taken over the whole lawn to the west of the house.  Its roots lay just under the grass as it likes to suck up the water we put on the lawn.  Any where you dig to the west of the house you will find roots varying from finger size, to arm size, and even to leg size.

We also devote serious garden bed space to flowers because we like the color.

For space reasons it seems more productive to grow things which go vertical  or are bushy (tomatoes and peppers). I am planning to plant pole beans this year.

Then there are economics. It just doesn't seem to pay to grow carrots or other root vegetables, while tomatoes and peppers and herbs seem more worthwhile.

And finally this is not generally a cool weather climate.  Once winter breaks we have a very short spring (winter has not really broken yet.) Cool weather plants like spinach and lettuce and peas do not do well. Also plants which do best in humid conditions (like sweet corn) are challenged since our climate is technically a desert… Sage brush and tumbleweed inhabited our yard when we moved in. 

Wednesday, April 01, 2009

Project One – Bill Pratt’s Greenhouse (corrected)

With time on my hands and motivated to live a little more frugally, I decided to start some seedlings.  I was also motivated by Josh, my neighbor, building a greenhouse, and offering me some space in it for my plants.  At the present time I have planted 7, 72 ‘pot’ trays.  They aren’t really pots, but little bags of peat.  The come looking sort of like buttons, but when you add water to them they grow to be about two inches high.  The first three trays are shown here…

project_1_2

This was the original planting.  The tray to the left contains (from the bottom up) – 1 row: Sweet Basil; 1 row: Cinnamon Basil; 2 rows: Jalapeno Peppers; 2 rows: Sweet Peppers; 2 rows: Cherry Tomatoes; 2 rows: Beefsteak Tomatoes; 2 rows: Roma Tomatoes.  The other two trays contain Marigolds… all sizes and colors.

I have since planted four more trays.  One of them is starting to sprout, and contains a variety of Herbs and African Daisies.  You can see the four trays under daylight lamps in this picture.

project_1_3  The greenhouse is not done yet, and there is no sunshine, so I have had to convert the guest (Nick and Alina’s) bathroom into a greenhouse.  I have the two sun lamps, and a space heater.  I am trying to keep the heat in the ‘greenhouse’ at about 75 degrees, as I have a whole tray of Impatiens planted, and they germinate best at that temperature.  I also planted a whole tray of Poppies Petunias.  Poppy Petunia seeds are just about the smallest seeds I have ever seen.  It took me quite a while to place 3 seeds, one at a time, into the little ‘pots.’

I will keep you posted on the progress of my plants.